
Oskarshamn 2 is one of three BWRs at the site, operated by OKG, itself a Swedish subsidiary of EOn. It entered commercial operation in 1975. Unlike a pressurised water reactor, steam from a BWR is fed directly to the turbines without passing through a heat exchanger. The upgrades to unit 2 are planned for completion in 2009.
OKG signed a contract with Alstom for a 250 MWe upgrade of the larger and more modern Oskarshamn 3 in 2006, including a turbine upgrade as well as reactor upgrade.
Sweden has ten operating nuclear power units, generating up to half its electricity.
Further information
Siemens Power Generation
OKG