The required specialist reinforcement and concreting works of the circular 'corridor' have been completed at Leningrad II’s unit 3 allowing the start of installation of the lower tier of the inner containment building.
Fabrication of the control assembly for the reactor vessel has begun for the fourth unit at the Akkuyu nuclear power plant in Turkey. Rosatom said it will be the 250th nuclear reactor manufactured in Russia.